Close/Exit

Carbon Capture and Storage Potential near 93-P-8, British Columbia

40000

This study is not included with a CDL ONE subscription and is therefore not eligible for the CDL ONE subscription discount. This price includes the study report (PDF) and underlying data. See terms & conditions.
This study is included with CDL's CCUS Intelligence Package. Subscribers receive access to this study as part of the package at a lower bundled price than purchasing the study individually.

Interested in this Study?

Fill out the form below and we'll be in touch with more details.
Close/Exit
menu icon
360

Carbon Capture and Storage Potential near 93-P-8, British Columbia

Peace River Arch, NE BC

Technical Studies Library Icon

CDL

VMCS

August 2025

Play(s):
N/A
Peace River Arch
Fluid(s):
Carbon Dioxide
N/A
Area:
Peace River Arch, NE BC
N/A
DLS/NTS:
DLS/NTS:

The study evaluates the feasibility of long-term carbon capture and storage (CCS) near the 93-P-8 in the Peace River Arch area of northeastern British Columbia. It identifies both depleted gas pools and saline aquifers within the Peace River Formation (Paddy and Cadotte members) as viable storage targets for injecting approximately 40 kilotonnes (kt) of CO₂ annually over a 20–25-year period. Five current and 12 future depleted pool candidates were identified, with effective storage capacities ranging from 1 to 19 megatonnes (Mt), while two aquifer zones showed localized P50 storage potentials of 1.5 Mt (Cutbank Cadotte) and 0.9 Mt (Swan Lake Cadotte). The study concludes that while promising opportunities exist, further site-specific dynamic modeling and economic assessment are essential to confirm injectivity, capacity, and long-term viability of the storage sites.