menu icon
224

Gilwood Hydrodynamics

Little Horse, AB

RPCL

BSLH

June 2000

Play(s):
N/A
Fluid(s):
Light Oil
N/A
Area:
Little Horse, AB
N/A

The objective of the project was to determine the potential for, and extent of, tilted oil/water contacts and trap flushing due to hydrodynamic flow. This project was set up as a trial of Rakhit Petroleum Consulting Ltd.’s (RPCL’s) hydrodynamic modelling methods. The method could ultimately be transferred to lands outside the current project area and provide a significant competitive advantage for exploiting this play type.